# Synchronizing Events and Deductions

Starting with Release 8.7, it is now possible to synchronize [events](https://docs.dataloy.com/release-8.7/voyage-management-system/step-by-step-guides/laytime-calculations/maintain-laytime-calculation/manage-cargo-ports/statement-of-facts) and deductions[ (not to counts) ](https://docs.dataloy.com/release-8.7/voyage-management-system/step-by-step-guides/laytime-calculations/maintain-laytime-calculation/manage-cargo-ports/timesheet)between a relet and the corresponding spot cargo, and vice versa. This reduces the manual effort needed when [reletting a cargo](https://docs.dataloy.com/release-8.7/voyage-management-system/cargoes/maintain-cargoes/cargo-drawer-actions/relet-cargoes#relet-a-cargo) since you no longer have to copy the events and deductions manually.

## How It Works

When synchronizing the relet or spot cargo, all[ laytime events](https://docs.dataloy.com/release-8.7/voyage-management-system/step-by-step-guides/laytime-calculations/maintain-laytime-calculation/manage-cargo-ports/statement-of-facts), as well as the ["not to count"](https://docs.dataloy.com/release-8.7/voyage-management-system/step-by-step-guides/laytime-calculations/maintain-laytime-calculation/manage-cargo-ports/timesheet) events, will be copied from the corresponding cargo. For example, if you synchronize a spot cargo with a relet cargo, all events from the relet cargo will be copied to the spot. Figure 1-3 illustrates this process.

<div><figure><img src="https://1675539307-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FJhyVcvJBzVdJKycXnSTF%2Fuploads%2F9yAG4uY5xw1Iz0oek5PL%2Fimage.png?alt=media&#x26;token=849a66ae-cb1b-47ad-9b9c-549951a954f4" alt=""><figcaption><p>Figure 1: The Relet Cargo we are syncing from</p></figcaption></figure> <figure><img src="https://1675539307-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FJhyVcvJBzVdJKycXnSTF%2Fuploads%2F1EcGckshcTWw47UX85Tj%2FScreenshot%202025-03-06%20083409.png?alt=media&#x26;token=18e12544-f287-4e09-83a5-4513943945c9" alt=""><figcaption><p>Figure 2: The Spot Cargo we are going to sync</p></figcaption></figure> <figure><img src="https://1675539307-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FJhyVcvJBzVdJKycXnSTF%2Fuploads%2FbEzfm9amSseVqo5MX3LA%2Fimage.png?alt=media&#x26;token=a230d8b5-cc4a-46ae-a2b9-af6ed4128a3b" alt=""><figcaption><p>Figure 3: The Results of Synchronizing</p></figcaption></figure></div>

## Synchronizing Events and Deductions

To synchronize a relet with its corresponding spot cargo, follow these steps:

1. Open the [Related ](https://docs.dataloy.com/release-8.7/voyage-management-system/step-by-step-guides/voyages/maintain-voyages/related)tab in the Voyage Drawer.
2. Expand the Laytime Calculations to access the Cargo Port Panel List.
3. In the Cargo Port Panel List, a *Synchronize Events and Deductions* button will be available for all relet and corresponding spot cargo ports.

To make it easier to identify which cargoes are relet and connected to a spot cargo, a **chip** has been added to the section header. See the figures below.

{% tabs %}
{% tab title="Relet Cargo" %}

<figure><img src="https://1675539307-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FJhyVcvJBzVdJKycXnSTF%2Fuploads%2F3TUiNA9e1v8YZSzeiVzU%2Fimage.png?alt=media&#x26;token=a45056da-68c7-4b92-9059-57d4675cecd1" alt=""><figcaption><p>Figure 4: Relet Cargo</p></figcaption></figure>
{% endtab %}

{% tab title="Spot Cargo" %}

<figure><img src="https://1675539307-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FJhyVcvJBzVdJKycXnSTF%2Fuploads%2FdRXr1DlECbr10695z9M6%2Fimage.png?alt=media&#x26;token=900ad45b-398c-46eb-b363-022f274ea615" alt=""><figcaption><p>Figure 5: Corresponding Spot Cargo</p></figcaption></figure>
{% endtab %}
{% endtabs %}

**NOTE:** When copying synchronizing the events and deductions, existing events and deductions ***will be overwritten***!

To prevent accidental overwrites, a confirmation modal will appear with a brief explanation. You must confirm your choice before synchronization. See Figure 6.

<figure><img src="https://1675539307-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FJhyVcvJBzVdJKycXnSTF%2Fuploads%2FznUg2UhsnL6O0pP6gYYW%2Fimage.png?alt=media&#x26;token=63df7e7e-9b0c-440b-af16-8e36c03d12cb" alt=""><figcaption><p>Figure 6: Synchronize Events &#x26; Deductions Warning Modal</p></figcaption></figure>

## Deletion of Cargo

Deleting either the relet or its connected spot cargo does not affect the other. Synchronization only occurs when you manually click the button and confirm the action.
