For the complete documentation index, see llms.txt. This page is also available as Markdown.

Maintain OPEX on a Vessel

Each vessel has its own OPEX list under the Operating Cost tab. Lines here represent the running costs specific to this vessel and are stamped onto the voyage when the vessel is assigned.


Opening the OPEX List

Navigate to the Vessel record and open the Operating Cost tab. The list of OPEX lines for this vessel is displayed.


Adding an OPEX Line

1. Click Create in the Operating Expenditure list.

2. Enter the required fields:

Field
Description

Opex Cost Code

Reporting code for this cost category.

Opex Cost Description

Name of the cost, e.g. "Crewing", "Lube Oil".

Daily Rate

Cost per day in the OPEX currency.

Currency

Currency of the rate.

From Date

Start of validity.

To Date

End of validity.

Stock Account

Accounting stock account reference.

Cost Account

Accounting cost account reference.

Comment

Optional free text.

3. Save.


Editing and Deleting Lines

All columns are editable in the list except Opex Cost Code. Select a line and click Delete to remove it. Removing a line from the vessel does not affect OPEX lines already stamped onto existing voyages.


Stamping onto a Voyage

When a vessel is assigned to a voyage, the system stamps the vessel's OPEX lines onto the voyage. If the vessel has no OPEX lines, the system falls back to the Vessel Type's default OPEX lines.

Important: Stamping is a one-time copy. Changes to the vessel's OPEX after the voyage has been created do not cascade to the voyage automatically. Voyage-level OPEX lines must be managed directly on the voyage.

Last updated

Was this helpful?