Maintain OPEX on a Vessel
Last updated
Was this helpful?
Each vessel has its own OPEX list under the Operating Cost tab. Lines here represent the running costs specific to this vessel and are stamped onto the voyage when the vessel is assigned.
Navigate to the Vessel record and open the Operating Cost tab. The list of OPEX lines for this vessel is displayed.
1. Click Create in the Operating Expenditure list.
2. Enter the required fields:
Opex Cost Code
Reporting code for this cost category.
Opex Cost Description
Name of the cost, e.g. "Crewing", "Lube Oil".
Daily Rate
Cost per day in the OPEX currency.
Currency
Currency of the rate.
From Date
Start of validity.
To Date
End of validity.
Stock Account
Accounting stock account reference.
Cost Account
Accounting cost account reference.
Comment
Optional free text.
3. Save.
All columns are editable in the list except Opex Cost Code. Select a line and click Delete to remove it. Removing a line from the vessel does not affect OPEX lines already stamped onto existing voyages.
When a vessel is assigned to a voyage, the system stamps the vessel's OPEX lines onto the voyage. If the vessel has no OPEX lines, the system falls back to the Vessel Type's default OPEX lines.
Important: Stamping is a one-time copy. Changes to the vessel's OPEX after the voyage has been created do not cascade to the voyage automatically. Voyage-level OPEX lines must be managed directly on the voyage.
Last updated
Was this helpful?
Was this helpful?