Create Time Charter In Contracts
A Time Charter Contract records the agreed terms under which a vessel is hired for a defined period. Time Charter In contract must be created in Time Charter Contracts - module.
To create a Time Charter Out contract go to Create Time Charter Out
Before Starting
Confirm the following master data is available in VMS before creating a contract:
The vessel exists and is active
The Business Partners (Owner and Charterer) exist in the system
The Company and Business Unit are configured
Steps:
Open Chartering → Time Charter Contracts from the left-hand menu.
In the top right corner, click the
icon.
Select Create Time Charter Contract.
The Create Time Charter Contract modal opens. The modal is draggable — hover over the title bar to reposition it and see information behind it.
3. Enter the required fields.
Vessel
The vessel to be hired.
✅
Delivery Port
The port where the vessel is delivered to the charterer.
✅
Delivery Date
The date the vessel is delivered.
✅
Redelivery Port
The port where the vessel is redelivered to the owner at the end of the charter.
✅
Company
The internal company under which this contract is recorded.
✅
Business Unit
The business unit within the company.
✅
Owner
The vessel owner counterpart.
✅
Charterer
The charterer counterpart.
✅
CP Date
The charter party date — the date the contract was agreed.
✅
Duration
The numeric length of the charter period.
✅
Duration Measurement
The unit of the duration — Days or Months. When set to Days, the Rate Unit is automatically fixed to /day and cannot be changed.
✅
Rate
The hire rate agreed in the contract.
✅
Rate Unit
The time unit against which the hire rate is expressed — /day or /month. Defaults to match the Duration Measurement. When Duration Measurement is Days, or when Index-based Hire is enabled, this field is set to /day and locked. See note below.
✅
Rate Currency
The currency of the hire rate.
✅
Bunker Currency
The currency used for bunker cost recording on this contract.
✅
Bunkers
The Delivery and Redelivery Bunker Terms per Bunker Category
Note: Rate Unit and Duration Measurement can differ. For example, a contract may have a duration expressed in months but a hire rate quoted per day. In this case, set Duration Measurement to Months and Rate Unit to
/day. All hire calculations and invoicing will use the Rate Unit, not the Duration Measurement.
Important: If Index-based Hire is enabled on the contract, Rate Unit is automatically set to
/dayand the field is disabled. This cannot be overridden.
4. Click Create.
The contract is created and opens in the Time Charter Contract drawer, where further details — including TC Duration periods, hire periods, and commissions — can be added.
The Create Modal:

Last updated
Was this helpful?